July 4, 2007
QSBC announces new board
The Quantity Surveyors Society of British Columbia (QSBC) elected its 2007 – 2008 Board of Directors at the association’s Annual General Meeting on May 17, 2007.
•President: Michael Garrett, PQS –Delta Land Development
•Vice President: Mark Russell, PQS – LEC Quantity Surveying
•Treasurer: Dave Housser, CEC – PCL – PCL Constructors Westcoast Inc.
•Secretary: Andrew Collins, PQS – University of British Columbia
•Past President: Gord Smith, PQS – BTY Group
•Director: Wayne Quanson, PQS – PCL Constructors Westcoast Inc.
•Director: Philip Pavitt, PQS – Bloc Building Consultants Ltd.
QSBC is the B.C. Chapter of its national counterpart, the Canadian Institute of Quantity Surveyors (CIQS). Members of QSBC can be identified by the acronym PQS (Professional Quantity Surveyor) or CEC (Construction Cost Estimator).
| MOST POPULAR STORIES |
- High-tech oil sands project near Fort McMurray, Alberta could change industry
- TransCanada begins construction on British Columbia-Alberta pipeline
- VIDEO: B.C. Construction Association welcomes standardized contract forms
- Port Mann Bridge under construction
- Crane accident kills worker at construction site in Burnaby, British Columbia
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 263 projects with a total value of $8,919,878,049 that Reed Construction Data Building Reports reported on yesterday.
NATURAL GAS PROCESSING FACILITY
$500,000,000 Fort Nelson BC Prebid
$250,000,000 Fort Nelson BC Negotiated
$35,000,000 Winnipeg MB Prebid
| CURRENT STORIES |
- Crane operator certification deadline looms in British Columbia
- High-tech oil sands project near Fort McMurray, Alberta could change industry
- Saskatoon bridge closed indefinitely over structural concerns
- City of Regina project turns up all sorts of surprises
- Awareness about qualifications-based selection lacking: Survey
- Canadian Institute of Steel Construction launches Steel Day
- Saskatchewan bridge collapses, causing crane to topple
- Crane tips over, killing worker and injuring two
- Saskatoon man pulled from hole at construction site
- Churchill airport gets government cash for infrastructure upgrades
- Stantec acquires health care architectural firm
- Ground broken on Halifax RCMP headquarters
- Fanshawe College’s new Centre for Applied Transportation Technologies goes green
- Vanbots continues work on York University Life Sciences Building in Toronto
- Manitoba introduces new farm building code
- Heavy rains wash away bridges to Nova Scotia fishing village
- South Korea calls for financial safety net
- Jobsite safety a shared duty: Mechanical Contractors Association
- New technology could help find Jimmy Hoffa: Study
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Canada’s construction starts in a transition phase (August 27, 2010)
- U.S. initial jobless claims rise to half a million again (August 19, 2010)
- It’s been 35 years since institutional construction starts as strong (August 6, 2010)
- More

















