LATEST NEWS
July 7, 2008
Natural Resource Extraction
Open-pit Ruby Creek mine gets approval from British Columbia government
The development of a $750-million mine at Ruby Creek in British Columbia’s northwestern corner is on track.
Vancouver-based Adanac Molybdenum Corporation has hired a consulting engineer and has received a permit the exploration and development of mines to produce molybdenum and other metals.
The company’s flagship property is the Ruby Creek molybdenum project, which is a low-grade bulk type of deposit, located at the headwaters of Ruby Creek near Atlin B.C.
The company announced that it retained a consulting engineer to provide technical, commercial and business advice. Earlier, the company announced the receipt of a provincial Mines Act permit for an open pit mine that would operate at 20,000 tonnes per day.
“This project is another example of the vibrant mining sector at work in British Columbia,” said Kevin Krueger, minister of state for mining.
“Ruby Creek mine will create approximately 550 jobs during the construction phase and approximately 250 direct jobs during the operations phase, greatly benefiting the local economy.”
The Mines Act permit is the most crucial approval issued by the B.C. government.
Along with other facets of development, it will allow for site preparation, earthworks, steel erection, mill construction and assembly, and open pit development.
Construction is expected to take about two years and, once in production, the mine is expected to operate for more than 20 years.
The Mines Act permit process was a subsequent step to the environmental assessment process, which focused on the potential impacts of the Ruby Creek project.
The province granted the project an environmental assessment certificate in 2007, following a review by B.C.’s Environmental Assessment Office.
The Taku River Tlingit First Nation participated in the technical working group and was involved in all aspects of the review.
Adanac embarked on a $750-million debt and equity financing initiative for the mine last October and expects to complete its financing this summer.
| MOST POPULAR STORIES |
- Massive blaze destroys Quattro 2 condo still under construction
- Unpaid foreign workers walk off the job at Golden Ears Bridge project
- Bantrel Construction employee dies in accident at Petro-Canada refinery
- Public-private partnership model risks squeezing out smaller firms, delegates say
- Battle brews over green-rating systems for high-rise residential buildings
- 20 Most Popular Stories
| CURRENT STORIES |
- Massive blaze destroys Quattro 2 condo still under construction
- Winnipeg Centre MP decries use of foreign trades on portions of airport expansion project
- U.S.-style housing crisis possible in Canada, Merrill Lynch Canada report finds
- World currency market activity benefits Canada and its construction industry, economist says
- Growth in white-collar sector critical to commercial real estate markets, expert says
- RAIC aims to educate owners and clients about the value architects bring to building projects
- Developer begins to pick up the pieces after Quattro condominium fire
- Labour markets, commodity prices will continue to challenge Canadian construction industry, economist says
- Provincial government plans to decommission Coquihalla Highway toll booths
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- Huge Potential for Commercial Banks from Black Monday (October 3, 2008)
- Black Monday was Nasty for the U.S. and Canada (October 2, 2008)
- A 13-Step Action Plan to Fix the Financial Mess (September 30, 2008)
Lifestyle Blog More 
- Three Cities with a Lot in Common: Calgary, Edmonton and Venice (September 29, 2008)
- How to Get Ahead in this Life (September 25, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Viljoen Architects readies working drawings for Stonebridge by the Bay (Sep 15, 2008)
- REC Silicon plans $1.2-billion manufacturing plant in Quebec (Sep 15, 2008)
- Construction underway at Interfor’s Adams Lake sawmill (Sep 11, 2008)
- Alcan moves closer to construction of Kitimat aluminum smelter (Sep 11, 2008)
- Town of Oliver presses on with plans for wine village (Sep 11, 2008)
