LATEST NEWS
Green Building | Water & Wastewater | Building Envelope | Skills Training | Trade Contracting
August 25, 2008
DOCKSIDE GREEN
The first phase of Dockside Green in downtown Victoria incorporates a community-wide integrated energy system.
Victoria’s Dockside Green community achieves LEED Platinum certification
The first phase of Dockside Green, a 1.3-million-square-foot community built on a former brownfield site in the heart of Victoria, has achieved LEED Platinum certification from the Canada Green Building Council.
The multi-million-dollar project is the largest redevelopment of city land in Victoria’s history.
It will eventually include a total of 26 buildings incorporating low and high-rise residential space, light industrial, office, commercial and retail development.
Spearheaded by Windmill West and Vancity Credit Union, the initial “Synergy” phase includes 95 homes in two condo buildings, townhouses and commercial space.
This phase was completed in March by Farmer Construction of Victoria.
Reportedly the highest scoring LEED Platinum project for new construction in the world, the development was designed by Vancouver architects Busby Perkins Will, which also developed the master plan for the 15-acre site.
All told, the project amassed 63 points out of a possible 70.
The integrated design team included Stantec, which was responsible for design of some of the key sustainability elements.
Dockside Green’s first phase achieved the maximum available score in several LEED categories, including energy, water efficiency, atmosphere, indoor environmental quality and innovation, Stantec said.
The project will incorporate a community-wide integrated energy system that includes heating from renewable biomass energy, district heating distribution and heat recovery, and on-site wastewater treatment.
Key sustainable features designed by Stantec include:
• The biomass energy system, which uses waste wood as fuel through a gasification process.
• Passive solar heating.
• An advanced building envelope and high-performance window glazing to help prevent heat loss.
• A 100-per-cent fresh air system with heat recovery.
• High-efficiency lighting and occupancy sensors.
• A 65-per-cent reduction in indoor water use with dual flush toilets, low-flow fixtures and use of gray water for sewage conveyance.
• Treatment of 100 per cent of the site’s wastewater in a campus-wide plant, which reuses it in central water features, toilet flushing and on-site irrigation.
The project is one of a handful in Canada to achieve LEED Platinum and the first master-planned development to target this level of certification.
Stantec has been involved with the design of more than 50 LEED-certified buildings in North America, including seven that achieved LEED Platinum.
It has one of the largest integrated building design teams in North America, currently with more than 335 LEED-accredited professionals.
| MOST POPULAR STORIES |
- Kiewit and Finning Canada workers die in Thormanby Island plane crash
- EarthFirst Canada obtains creditor protection related to Dokie wind energy project
- Metro Vancouver digs deep to hire new contractor for North Vancouver Water Filtration Project
- Victims of Thormanby Island plane crash identified
- Recycling of construction and demolition waste at Water Centre project pays off
- 20 Most Popular Stories
| CURRENT STORIES |
- Victims of Thormanby Island plane crash identified
- Work resumes at Plutonic Power’s Toba Inlet site
- Alberta responds to economic crisis by offering transitional royalty rates to promote new drilling
- RCMP release details of investigation into Thormanby Island plane crash
- La Rive condo takes shape at the edge Calgary’s Elbow River
- Kiewit and Finning Canada workers die in Thormanby Island plane crash
- Metro Vancouver digs deep to hire new contractor for North Vancouver Water Filtration Project
- Canadian construction, engineering companies join push for more federal infrastructure spending
- A call to arms for all Canadian architects to advocate on behalf of their profession
- LEED Canada Initiative continues to evolve and change
- British Columbia bucks September’s building-permits trend
- Laptops become more prominent on Canadian construction sites
- International labour mobility key to weathering current economic storm
- Rocks tumble onto Sea-to-Sky highway again
- Canadian residential real estate now a buyer’s market, according to Scotia Economics
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- The Outlook for Canada’s Home Renovation Market (November 21, 2008)
- Labor Markets in a Recession − Production Workers to Take a Pasting (November 20, 2008)
- Canada’s Construction Starts have Underperformed in 2008 (November 14, 2008)
Lifestyle Blog More 
- The Most Serious Letter in the Alphabet (November 17, 2008)
- The Wise Old Rooster (November 10, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Great Lands Global Realty begins work on Mona Lisa condominium (Nov 18, 2008)
- Life Construction accepts sub-trade pricing for Bayview Villas townhouse development (Nov 17, 2008)
- Joseph D. Battaglia Architect seeks municipal approvals for North York development (Nov 14, 2008)
- Page+Steele approaches completion of working drawings for Bravo condominium (Nov 14, 2008)
- Burka Architects complete designs for Brownstones on Wallace project (Nov 14, 2008)
