LATEST NEWS
Trade Contracting
October 22, 2008
Wind Power
EarthFirst Canada announces installation of British Columbia’s first commercial wind turbine
British Columbia’s first commercial wind turbine has been installed on the Dokie Wind Project.
EarthFirst Canada Inc. announced that the 3 MW Vestas V90 wind turbine was fully assembled on October 6, 2008 at the construction site, which is about 50 kilometres northwest of Chetwynd, British Columbia.
When connected to the grid, the first turbine will provide enough electricity to power about 700 typical British Columbia homes.
The turbine is the first of seven that will be installed this year.
They will produce power for B.C. homes in early 2009 and another 41 turbines will be installed in 2009.
When the full 144 MW Dokie Wind Project is completed at the end of 2009, it is expected to power about 33,000 typical B.C. homes. Another wind power project is being built at Bear Mountain on Vancouver Island.
JOC News Service
| MOST POPULAR STORIES |
- Alberta construction labour outlook not so bright
- How to get security clearance for federal contracts
- Canadian temporary foreign workers bill still has a low profile
- $10 million steel dragon makes a grand entrance in Chilliwack, British Columbia
- Calgary construction projects posted online
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 315 projects with a total value of $1,397,361,898 that Reed Construction Data Building Reports reported on yesterday.
$169,000,000 Calgary AB Negotiated
$50,000,000 Province of Alberta AB Prebid
$31,400,000 Chilliwack BC Tenders
| CURRENT STORIES |
- Union highlights deficiencies in construction of Vancouver 2010 Olympic village
- Engineers advocate Qualifications Based Selection for public construction projects
- Construction restarts at stalled oilsands project in Fort McMurray, Alberta
- Competition produces new visions of seniors’ housing
- Worker fatally crushed in Edmonton
- Wolfe Island, Ontario wind farm in operation
- Decision to delay Darlington nuclear power plant carries job cost
- Boutique building takes shape in Toronto
- Algonquin College’s new Ottawa facility will have trades working together
- Project phasing keeps Sault Ste. Marie, Ontario industry near full employment
- Solaris @ Metrogate Phases I and II shaping up in Toronto
- Stantec to rehabilitate major Boston sewer tunnel
- U.S. non-residential construction rises as general industry spending drops
- Developers order Vancouver 2010 Olympic village review
- Romanian Bishop calls office building ‘hideous’ and ‘illegal’
- U.S. manufacturing in ‘slow recovery’ mode
- PTI Group lands field accommodation job for 2010 Vancouver Olympics
- Malaysia bans high-rises on resort island
- Deere’s salaried workers in U.S. line up for buyout program
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Orillia Market Square aims for LEED Silver certification (Jun 25, 2009)
- Designs for new York Region District School Board building features energy efficiency (Jun 23, 2009)
- Vancouver Convention Centre expansion sets new standards for environmental design (May 22, 2009)
- Waterloo partnership seeks LEED Silver for West Side Family YMCA and District Library (May 22, 2009)
- IPC Energy considers Milford location for future wind farm (May 22, 2009)