JOC ARCHIVES

July 28, 2010

MCKNIGHT CHARRON LAURIN INC. ARCHITECTS

Georgian College’s new 20,000 square foot facility will house nine classrooms.

Georgian College expansion goes green in Collingwood, Ontario

Construction is expected to get under way early next month on Georgian College’s permanent home in Collingwood Ont., a 20,000-square-foot facility to house nine classrooms as well as a student lounge.

Designed by Barrie’s McKnight Charron Laurin Inc., the estimated $4.3 million facility will include two computer labs, one e-lab, one multi-functional health sciences lab and a community room/small classroom.

The balance will be traditional classrooms, all equipped with full multi-media services.

Multi-function rooms will be fitted with movable walls for maximum flexibility in terms of space.

Administrative offices and space for small business incubation activities will be provided as well.

The new building will accommodate 250 full-time students and more than 3,000 part-time students annually.

Architect Michael McKnight said the two-storey, steel-frame building is intended to be accessible and transparent in all senses of the word.

“We wanted to make sure that people on the inside can see out and that people approaching the building can see what goes on inside,” he said.

Building materials include curtainwall, as well as brick and metal veneer systems.

While the building has not been designed to achieve LEED certification per se, it will be highly energy-efficient as well as sustainable, McKnight said.

“We’re working with engineers with experience on LEED projects.”

The consultant team includes mechanical engineers Aegis Engineering Ltd., electrical engineers e-Lumen International Inc., structural engineers SWS Engineering Inc. and site services engineers Greenland. The firm of MHBC is providing both planning and landscape architecture services.

McKnight, whose firm has undertaken projects at various Georgian College campuses, said the Collingwood facility has been designed to be “quickly constructible,” given a tight eight-month construction schedule.

Construction must be completed by the end of next March.

The building is being constructed on a greenfield 10-acre site donated by developer John Di Poce.

Funding is being provided by the Federal Economic Development Agency for Southern Ontario.

McKnight said eight general contractors have been prequalified to bid the project along with six mechanical contractors and five electrical contractors. Tenders close soon.

The new campus is scheduled to open for classes in the fall of 2011.

Print | Email | Comment

MOST POPULAR STORIES
TODAY’S TOP CONSTRUCTION PROJECTS

These projects have been selected from 338 projects with a total value of $1,555,870,391 that Reed Construction Data Building Reports reported on yesterday.

COLLEGE BUILDING

$100,000,000 Grande Prairie AB Prebid

CONDOMINIUM APARTMENT TOWER COMPLEX

$75,000,000 Surrey BC Prebid

WIND FARM

$75,000,000 Mount Waddington RD BC Negotiated

Daily Top 10

ALEX’S ECONOMICS BLOG

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.

TODAY’S TOP JOBS

INDUSTRIAL MECHANIC
Ontario-Welland

MECHANICAL DESIGN/DRAFTER - PLANT LAYOUT
Ontario-Woodbridge

PROJECT MANAGER
Saskatchewan-Regina

MECHANICAL DESIGNER
Ontario-Toronto

PROJECT ENGINEER
Ontario-Mississauga

WIREMEN/ELECTRICAL TECHNICIAN
Ontario-Brampton

INDUSTRIAL ENGINEER (AUTOMOTIVE)
Ontario-Bradford

SENIOR PROCESS ENGINEER - HYDROMETALLURGY
Ontario-Toronto

ESTIMATOR
Alberta-Edmonton

ELECTRICAL MANAGER
Ontario-Toronto

More jobs 

myJobsite.ca

Your gateway to
the top careers
in construction
and design