LATEST NEWS
February 13, 2012
Labour federation opposes pipeline
The Alberta Federation (AFL) of Labour is opposing construction of the Northern Gateway pipeline from the Alberta oilsands to Kitimat, British Columbia on the grounds that the construction jobs would only be "transitory," higher oil prices would result and jobs in refining would not be created in Canada.
AFL announced this week it is filing a third-party report, by economist Robyn Allan, as evidence to the federal panel currently considering Enbridge Inc.’s application to build the pipeline.
If approved, the 1,150-kilometre Northern Gateway would take bitumen from Bruderheim, Alberta and send it to the port of Kitimat for export abroad.
The project also proposes construction of an import condensate pipeline, terminal facilities and marine infrastructure in Kitimat.
A joint review panel established by the National Energy Board is holding hearings and AFL submitted Allan’s report after NEB denied it intervenor status. In its own submission, the Alberta Federation of Labour argued the pipeline would result in the loss of tens of thousands of potential jobs in upgrading, refining and petro-chemical production.
“Construction jobs would be ‘transitory and migratory’ lasting three to four years at the most,” the AFL argued.
The press release comes a week after the director of Canadian affairs for Building and Construction Trades Department (BCDT) of the American Federation of Labour-Congress of Industrial Organizations (AFL-CIO), Robert Blakely, came out in support of Northern Gateway.
At the time, Blakely stated he was encouraged by a promise by Prime Minister Stephen Harper that the federal government would ensure energy and mining projects are not subject to unnecessary delays.
At the time, Canadian Building Trades noted the jobs created by Northern Gateway would include those in permanent operations and maintenance, not only in construction.
Canadian Building Trades also supported TransCanada Corp.’s application to build the Keystone XL pipeline that would carry oilsands crude from Alberta to Texas.
That application was denied by the United States Department of State but TransCanada plans to submit a new application.
Both Allan and the AFL agree the Northern Gateway would cause an increase in oil prices.
“The good news is that there is a way to avoid the price shock that Robyn talks about,” said AFL president Gil McGowan about the release.
“By doing more upgrading and refining in Canada, we can make sure that Canadians keep much more of the value created by development within the country. And, by developing markets in eastern Canada instead of Asia, we can ensure that Alberta’s growth isn’t coming at the expense of growth in other provinces.”
Allan was a commissioner on the Barrett Commission of Inquiry into the Quality of Condominium Construction in B.C.
She has also been president and CEO of the Insurance Corporation of British Columbia.
JOC NEWS SERVICE
| MOST POPULAR STORIES |
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 425 projects with a total value of $5,472,383,138 that Reed Construction Data Building Reports reported on Tuesday.
$60,000,000 Kelowna BC CANCELLED/ DEFERRED
WASTEWATER TREATMENT PLANT UPGRADES
$45,000,000 Grande Prairie AB Tenders
$30,000,000 West Vancouver BC Tenders
| CURRENT STORIES |
- High School Construction
- Victoria bridge inches closer to construction
- Collapse injures worker at Commonwealth Stadium
- Panel appointed to oversee hearings into B.C. mine project
- Bockstael celebrates 100 years
- More work needed to protect flaggers
- Co-founder of ATCO announces his intention to step down as chair
- SNC-Lavalin hit with $1.5 billion class action lawsuit
- PST returns to British Columbia
- Where does labour law stand on ladder safety?
- Construction continues on the MaRS Centre Phase II in Toronto
- Bending Lake Iron Ore pushes ahead with mining plans
- Reserve Properties continues plans for 109OZ condos in Toronto
- Ontario courts rule against owners rejecting low bids using undisclosed criteria
- Westray disaster 20th anniversary a call to safety action
- Dirt moves as Saskatchewan announces highway work
- Worker hurt in dressing room ceiling collapse at Edmonton stadium
- IBI Group raises $40.5 million from stock issue
- Plazacorp to spend $12.2 million on retail property development in 2012
- Ottawa to proceed with preliminary Lansdowne Park construction work, short-lists PCL, EllisDon and Pomerleau
- VIDEO: Highlights from the May 17 Daily Commercial News
- VIDEO: Common ladder safety errors in construction
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Economic Nuggets - May 15, 2012 (May 14, 2012)
- Canada Rode a Second Consecutive Month of Strong Job Gains in April (May 11, 2012)
- U.S. Employment Rose by a Mediocre 115,000 in April (May 4, 2012)
- More









