| Note: | Scope of the project has been revised and is currently going through the environmental assessment process with the BC Environmental Assessment Office. Engineering design and construction schedules to be confirmed in spring 2013. Further update at that time. The budget is undefined. This was previously known as the Terasen Inland Pacific Connector (IPC). Please note the new construction start date. |
| Project: | 02230; clearing and grubbing, 02240; site preparation, 02550; gas distribution, 02550; natural gas distribution, 02550; piped energy distribution, 04220; concrete masonry units, 13120; pre-engineered structures, 13120; industrial buildings, 13120; metal building systems, 15190; liquified petroleum gas systems, construction of a new 24-inch (610 mm) diameter, 161 kilometres long natural gas transmission pipeline generally alongside the existing FortisBC pipeline between the existing Kingsvale Compressor Station connection to the Specta pipeline near Merritt and existing Oliver Y Control Station. Scope of work includes construction of a new compressor station at a new location near the existing SCP-Foothills pipeline connection near Yahk inclulding a 1 km extension of the existing FortisBC Southern Crossing Pipeline (SCP) to connect the proposed Yahk compressor station; construction of additional compression capability adjacent to the existing Kingsvale Compressor Station. |
| Scope: | 1 storey; 8 structures |
| Development: | Engineering |
| Category: | Pipelines; Misc engineering |
| Owner | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Project manager | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Coordinator | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Consultant | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|