HYDROELECTRIC GENERATING STATION Proj: 9095107-6
Kitimat-Stikine RD, BC DEFERRED
Kinskuch River Power Project, 50 Km E of Stewart, 30 Km N of Alice Arm, on Kinskuch River
$180,000,000 est
Note: The project is considered to be one of Syntaris's core projects and a draft application had been submitted to the BC Environmental Assessment board in 2009, but the owner has received confirmation from the Gov't that its re-sizing (increased to 90 MW ) and re-application for assessment of the Kinskuch RIver/Lake project has been accepted. The re-filing was necessitated by the requirement for a new transmission plan due to the sale of some assets. In engineering design and the construction schedule is undetermined. Update in Spring 2013.
Budget is TBD. Website: www.syntaris.com.
Project:concrete slab on grade foundation, cast-in-place concrete structural frame, structural steel frame, 02580; electrical transmission equipment, 13120; industrial buildings, 90 MW run-of-river power project with three Pelton turbines & a 40 Km 138 kV hi-frame transmission line, to connect into the BC Hydro 1L381 transmission line along Hwy 37.
Scope:1,100 m²; 1 storey; 2 structures
Development:Engineering
Category:Elect power, building; Elect power, engineering
Owner Complete information is available to subscribers. Click HERE to find out how to subscribe.
Owner Complete information is available to subscribers. Click HERE to find out how to subscribe.
Other bldg designer Complete information is available to subscribers. Click HERE to find out how to subscribe.
First report Wed Jan 28, 2009. Last report Mon Jan 21, 2013.
This report Mon May 13, 2013.