| Note: | The project is considered to be one of Syntaris's core projects and a draft application had been submitted to the BC Environmental Assessment board in 2009, but the owner has received confirmation from the Gov't that its re-sizing (increased to 90 MW ) and re-application for assessment of the Kinskuch RIver/Lake project has been accepted. The re-filing was necessitated by the requirement for a new transmission plan due to the sale of some assets. In engineering design and the construction schedule is undetermined. Update in Spring 2013. Budget is TBD. Website: www.syntaris.com. |
| Project: | concrete slab on grade foundation, cast-in-place concrete structural frame, structural steel frame, 02580; electrical transmission equipment, 13120; industrial buildings, 90 MW run-of-river power project with three Pelton turbines & a 40 Km 138 kV hi-frame transmission line, to connect into the BC Hydro 1L381 transmission line along Hwy 37. |
| Scope: | 1,100 m²; 1 storey; 2 structures |
| Development: | Engineering |
| Category: | Elect power, building; Elect power, engineering |
| Owner | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Owner | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Other bldg designer | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|