| Note: | Owner has recently submitted the project to the BC Environmental Office for pre-application process for the environmental assessment. Engineering design and construction schedules to be confirmed in fall 2013. Further update at that time. |
| Project: | construction of an open pit mine and ore processing facilities with a milling rate capacity of 60,000 t/d (22 Mt/y), over 17 years. Scope of work includes mine site, mine access road, and a new 133 km transmission line that connects the mine site with the existing substation to provide power to the project. |
| Development: | Engineering |
| Category: | Misc engineering; Processing plants; Roads |