| Note: | Site preparation and construction activities are underway along the transmission line route. AltaLink and Epcor are partnering on this project. |
| Project: | construction of a 500-kV double circuit transmission line which will connect the Heartland region (northeast of Fort Saskatchewan) to existing 500 kV facilities. |
| Development: | Engineering |
| Category: | Elect power, engineering |