Federation of Canadian Municipalities List of 2009 ‘Shovel Ready’ Municipal Infrastructure Projects

See Canadian municipalities unveil extensive list of ‘shovel ready’ infrastructure projects

British Columbia

Estimated
Project Cost
Est.
Jobs
Created
City of Campbell River Pop: 29,572
Category: Public Transit
Construction of New Transit Interchange $400,000 5
City of Kamloops Pop: 80,376
Category: Public Transit
New Transit Facility $12,000,000 137
Category: Roads and bridges
Arterial Road Rehabilitation $1,200,000 14
Local Roads Overlays $500,000 6
Rural Road Upgrading $75,000 1
Collector Road Rehab $650,000 7
Local Roads Rehab $850,000 10
Lane Paving $200,000 2
Category: Water and wastewater
Storm Drainage Rehab $130,000 1
Drainage Rock Pit Upgrading $100,000 1
Water main Rehab. In conjunction with Roads $575,000 7
Category: Buildings
Roof water stations Rehab $100,000 1
Category: Water and wastewater
Water electrical/transformers Rehab $400,000 5
Sewer main Rehab $100,000 1
Sewer electrical Rehab $100,000 1
Category: Buildings
ISC Arena ceiling and stairs Rehab $255,000 3
SC Arena roof repairs $280,000 3
City of Kelowna Pop: 106,707
Category: Public Transit
Bus Rapid Transit Project $25,000,000 285
Expansion of Existing Transit Facility $7,000,000 80
City of Prince Rupert Pop: 12,815
Category: Solid Waste
Landfill Development $600,000 7
Category: Water and wastewater
Hays Creek Sewer Project – Current BCF Application $4,000,000 46
Category: Roads and bridges
Residential Paving Program $650,000 7
City of Surrey Pop: 394,976
Category: Water and wastewater
Bridgeview Area Sewer Replacement $5,000,000 57
Water Meter Installations $4,000,000 46
Fraser River Dyking/ Flood Protection $7,250,000 83
Robson Ravine Diversion Sewer $4,000,000 46
Robson Park Storm water Management System $5,500,000 63
Category: Roads and bridges
160 Street Improvements, from 96 Avenue to 103 Avenue (1.4 km) $11,250,000 128
96 Avenue Improvements, from 168 Street to 176 Street (1.6 km) $12,000,000 137
Fraser Highway - Serpentine River Bridge $3,000,000 34
84 Avenue Improvements, from 136 Street to 140 Street (0.8 km) $6,200,000 71
96 Avenue Improvements 152 Street to 160 Street $12,000,000 137
32 Avenue Improvements from 160 Street to 168 Street $9,500,000 108
152 Street/32 Ave/Hwy 99 Interchange $8,000,000 91
24 Avenue/ Hwy 99 Interchange $5,000,000 57
King George Highway Improvement from Colebrook Road to Highway 99 $25,000,000 285
Pavement Rehabilitation $13,500,000 154
City Centre Ring Road $9,000,000 103
128 Street from 109 Avenue to King George Highway $18,000,000 205
Category: Buildings
Kensington Prairie Community Centre renovations $1,600,000 18
Construct an RCMP detachment building to serve North Surrey $20,000,000 228
City of Vancouver
Category: Water and Sewer
Trout Lake Stormwater Project $9,000,000 103
Upper Trout Lake East Sewer Separation $10,000,000 114
Upper Trout Lake West Sewer Separation $10,000,000 114
North Balaclava Sewer Separation $9,900,000 113
Greening of the English Bay Interceptor $5,000,000 57
Hastings Pond Area Sewer Separation $11,000,000 126
Upper Grandview-Woodlands Area Separation $8,500,000 97
Pressure Regulating Valve (PRV) Replacement Program – 4 locations $2,000,000 23
Contracted Distribution Main Replacement $2,500,000 29
Structural Lining Project $2,000,000 23
Park Sewer Upgrades $1,200,000 14
Category: Road Rehabilitation
Granville Bridge Strengthening $5,500,000 63
Grandview Viaduct Rehabilitation $5,000,000 57
Lakewood and Nanaimo Street Bridges - Shear Upgrades $1,500,000 17
Disability Access to Streets and Sidewalks: Curb Ramps $2,000,000 23
Bute Street Greenway $2,600,000 30
North Arm Trail Greenway (59th Avenue) $3,000,000 34
Stanley,Queen Elizabeth Park Roads $6,000,000 68
Category: Buildings
Police Property Office and Forensic Storage Facility $30,300,000 346
Fire Hall #15 Replacement $6,100,000 70
Urban Search and Rescue Facility $12,000,000 137
Building Rehabilitation Program $8,000,000 91
Granville Residence (COV) $40,000 0
Old Continental Residence (COV) $184,800 2
Barclay Heritage Square (VPHC) $140,000 2
Category: Public Housing
Affordable Housing Program $60,000,000 685
Affordable/Social/Supportive Housing $210,000,000 2,397
Affordable Housing Program $4,000,000 46
City of Vernon Pop: 35,944
Category: Public Transit
New Transit Facility $10,000,000 114
City of Victoria Pop: 78,057
Category: Public Transit
Bus Stop Improvement Program $4,270,000 49
District Municipality of Saanich Pop: 108,265
Category: Roads and bridges
Admirals Bridge $3,000,000 34
Wilkinson/Interurban intersection $4,200,000 48
Admirals road south of bridge $3,300,000 38
Mt Douglas Shoreline Restoration Stage I $4,500,000 51
Category: Water and wastewater
Rithet Reservoir Seismic $5,000,000 57
Category: Buildings
Mckenzie Avenue Public works facility (fire and safety code Rehab) $1,000,000 11
Category: Water and wastewater
Shelbourne Sewer replacement $1,000,000 11
Portage inlet Sewer Lift stations replacement $2,000,000 23
Stave Drain Replacement $1,900,000 22
District of Maple Ridge Pop: 68,949
Category: Water and wastewater
Creek Crossing Replacement (Kanaka Cr S of Lougheed) $220,000 3
Main Replacement (125 Ave - 241 St - Ansell) $410,000 5
Main Replacement (Dewdney Trunk - Laity - 216 St) $400,000 5
Pressure Reducing Valve 236 S of 132 $180,000 2
Reservoir Twinning - 263rd $1,500,000 17
Sewer Extension to Corrections Part A $1,000,000 11
Category: Roads and bridges
119 Ave (226 - 227) Highway $485,000 6
132 Ave (203 - Neaves) Resurface $442,800 5
203 St @ Lougheed Intersection Upgrade $50,000 1
232 N Alouette Bridge replacement $1,500,000 17
232 St (116 St - Slager) LTC 2823 $2,031,786 23
232 St (S Alouette - Abernethy) Phase 1 $1,000,000 11
232 St @ 128 Signal $250,000 3
240 St @ Kanaka Creek (Bridge) $8,106,657 93
Abernethy Way (210 - 500M E Blackstock) $3,297,101 38
Bikeway Program - 2009 $100,000 1
Cottonwood Dr (118 - 119) Highway $606,000 7
Creek Crossing (104 Ave by 245 St) $1,250,000 14
Cycling Corridors (210 St, 128-Old Dewdney Trunk) $200,000 2
Cycling Corridors (Lougheed & 210 St) $250,000 3
Dewdney Trunk @ 256 St Upgrade Phases 1 & 2 $387,500 4
Lougheed Hwy Downtown (223-224) $500,000 6
Reconstruction of 203 St (123-Powell) $1,360,824 16
Reconstruction of 203 St (DTR-123) $2,793,159 32
Metro Vancouver Pop: 2,300,000
Category: Solid waste
Regional organics processing facilities $40,000,000 457
Waste-to-Energy Facility NOx Reduction Project $40,000,000 457
Waste-to-Energy Facility Feedwater Treatment Plant Upgrade $1,050,000 12
Waste-to-Energy Facility Seismic Upgrades $6,000,000 68
Category: Water and wastewater
Lions Gate Wastewater Treatment Plant - project definition report $2,500,000 29
Coquitlam - UV Disinfection $110,000,000 1,256
Barnston Maple Ridge Pump Station $23,800,000 272
16th Ave Main No. 2 $6,700,000 76
25th Ave. Main - No.2 Phase 3 & 4 $4,500,000 51
Angus Drive Main Scour Protection $1,425,000 16
Cleveland Dam Elevator Replacement $7,300,000 83
Douglas Road Main No. 2 - Royal Oak Pre-Build $2,000,000 23
Douglas Road Main No. 2 - 13th Ave Sect $16,700,000 191
Capilano Main No. 5 Seismic Remediation Construction $1,400,000 16
Port Mann No. 2 Fraser River Crossing (Construction) $199,000,000 2,272
Second Narrow Crossing (Tunnel) - Design $4,500,000 51
Newton Reservoir - Seismic Upgrade $3,300,000 38
Mathers Avenue Capilano River Crossing Replacement - Prelim Design $500,000 6
Port Moody Connector Meter $400,000 5
Central Park Distribution System Optimization $12,000,000 137
South Surrey Main Structural Review and Condition Analysis $249,887 3
FSA - Annacis Island Stage 5 - Trickling Filter Pump $2,600,000 30
FSA - N Nicomekl Trunk Sewer No. 2 - Construction $14,000,000 160
FSA - Sapperton Pump Station Replacement $30,000,000 342
FSA - South Surrey Interceptor - King George Section $27,000,000 308
VSA - Iona - CEPT System Replacement $7,000,000 80
VSA - Iona - MCC/Power Distribution Assess / Replace 2009 $1,375,000 16
NSA - Lions Gate Power Dist MCC Replace/Transformers 2009 $830,000 9
NSA - Lions Gate-Digester-#4 Refurbishment Construction $7,360,000 84
FSA - Annacis WWTP - Disinfection System - Construction $13,000,000 148
FSA - Crescent Beach FM Scour Protection $638,000 7
FSA - Marshend PS Rehab Construction $7,000,000 80
FSA - South Surrey Interceptor Rehab. $3,200,000 37
VSA - Highbury Interceptor North Arm Crossing - Upgrade of Siphons $12,000,000 137
VSA - Jervis Forcemain - Planetarium Section Replacement - Construction $9,000,000 103
NSA - LGWWTP Sodium Bisulfate System $1,410,000 16
NSA - Lions Gate WWTP Third Influent Screen $820,000 9
FSA - Coquitlam Interceptor Repair Lougheed Section $3,800,000 43
FSA - Annacis Stage 5 Expansion Phase 1 $133,705,600 1,526
VSA - Jervis Forcemain Extension to 8th Avenue Interceptor $9,000,000 103
NSA - Lynn Creek SSO Treatment - Design $750,000 9
FSA - Cloverdale SSO Treatment - Pre-Design $150,000 2
FSA - Katzie SSO Treatment - Pre-Design $150,000 2
Annacis Island Wastewater Treatment Plant Cogeneration Heat Recovery Exchanger Repair $150,000 2
Annacis Island Wastewater Treatment Plant Digester Gas Compressors Replacement $800,000 9
Annacis Island Wastewater Treatment Plant Digester Valve Replacement $200,000 2
Annacis Island Wastewater Treatment Plant Gravity Thickener Corrosion Repair $250,000 3
Annacis Island Wastewater Treatment Plant North Cogeneration System Replacement $750,000 9
Annacis Island Wastewater Treatment Plant Primary Aeration Tank Corrosion Repair $1,500,000 17
Annacis Island Wastewater Treatment Plant SCT Diffuser Replacement $200,000 2
Annacis Island Wastewater Treatment Plant Secondary Clarifier Corrosion Repair $200,000 2
Annacis Island Wastewater Treatment Plant Trickling Filter Pump Vibration Reduction $800,000 9
Annacis Island Wastewater Treatment Plant Trickling Filter Domes Refurbishment $240,000 3
Iona Island Wastewater Treatment Plant Bar Screen Refurbishment $200,000 2
Iona Island Wastewater Treatment Plant Influent Pump Station VFD Replacement $750,000 9
Iona Island Wastewater Treatment Plant Primary Clarifiers Roof Removal $500,000 6
Iona Island Wastewater Treatment Plant Primary Electrical Feeder Replacement $250,000 3
Iona Island Wastewater Treatment Plant Roof Remediation $150,000 2
Iona Island Wastewater Treatment Plant Ventilation System Upgrades $1,500,000 17
Lions Gate Wastewater Treatment Plant Administration Building and Roof Remediation $600,000 7
Lions Gate Wastewater Treatment Plant Diesel Storage Tank Remediation $120,000 1
Lions Gate Wastewater Treatment Plant Gravity Thickener Settlement Repair $500,000 6
Lions Gate Wastewater Treatment Plant Boiler Replacement $250,000 3
Lions Gate Wastewater Treatment Plant Gas Compressor Replacement $800,000 9
Lulu Island Wastewater Treatment Plant Roof Remediation $50,000 1
Northwest Langley Wastewater Treatment Plant Roof Remediation $150,000 2
Biofilter Media Replacement $350,000 4
Annacis - Biofilter Media Replacement $450,000 5
Annacis - Digested Sludge Storage Tank Cleaning & Liner $3,180,000 36
Annacis - Co-digestion System - pilot plant $480,000 5
Annacis - Reclaim water system upgrade using membrane technology (Design phase) $250,000 3
Iona - Old Diesel Tank Removal $50,000 1
Iona - Effluent Conduit Insulation Test Sections (Assessment) $165,000 2
Iona - Ventilation + Gas Detection (Assessment) $60,000 1
Iona - Thickened Sludge Grinders (Assessment) $110,000 1
Lions Gate - C2 Water Offset System (Design phase) $100,000 1
Lions Gate - Chlorine Contact Tank Reclamation $100,000 1
Lions Gate - Digester Gas Drying $100,000 1
Lions Gate - Effluent Dechlorination System (Assessment and Evaluation) $700,000 8
Lions Gate - HVAC Upgrade - Design & Construct $700,000 8
Lulu - SHS Disinfection System Upgrade $1,300,000 15
Annacis WWTP Wastewater Research Centre ( Sustainability Academy) $9,000,000 103
Struvite extraction facility at the Lulu WWTP $1,500,000 17
Beach Yard Water Control Valve Replacement $150,000 2
Water system pressure gauge elevation verification $358,000 4
Conversion of water operation drawings to metric units $500,000 6
Side stream injection for Pitt River and Cape Horn secondary disinfection sites $450,000 5
Coquitlam Ozone Plant replace valve operators $80,000 1
Coquitlam Cross Over Chamber Residual Analyser $100,000 1
Central Park Pressure Metering Instrumentation upgrade $100,000 1
River Road Flow and Pressure Instrumentation upgrade $350,000 4
Grandview/ Sunnyside main Flow and Pressure Instrumentation upgrade $250,000 3
Delta and Albert Instrumentation upgrade $150,000 2
Devon Gardens (delta) instrumentation upgrade $150,000 2
5 Olympic water quality monitoring stations $360,000 4
Decommission abandoned watermains 44AM, BO2, BO3, DRM1 $4,000,000 46
Drain Line Rehabilitation $7,000,000 80
Capilano reservoir turbidity buoy replacement $100,000 1
Security upgrades at 8 secondary disinfection stations $250,000 3
Coquitlam water treatment plant equipment enclosures $250,000 3
PVC pipe replacement at 3 secondary disinfection stations $96,000 1
Coquitlam water treatment plant access road paving $500,000 6
SCFP Entrance and Guard house $625,000 7
Coquitlam Chlorine gas conversion to Onsite generation $10,000,000 114
New Coquitlam Soda Ash Silos $5,000,000 57
Newton secondary disinfection upgrades $140,000 2
Reservoir inlet valve replacement - Kersland, Central Park $200,000 2
Westridge PS #1 emergency power supply $500,000 6
Westburnco PS emergency power supply $500,000 6
South Surrey Odour Control Facility $300,000 3
Seymour Falls Dam - Submerged Debris Removal $500,000 6
Cleveland Dam - Diversion Tummel Inspection $500,000 6
Sewer Access Road $250,000 3
Aerial Crossings Coating Replacement $500,000 6
Beach Yard Fencing $250,000 3
Water Reservoir Cleaning $250,000 3
Coquitlam Lake Boat Ramps $200,000 2
Westbay Piezometric Drill Hole $250,000 3
Coquitlam Interceptor Improvement $5,000,000 57
North Surrey Interceptor Manhole Improvements $400,000 5
Blundell Trunk Sewer - Manhole Improvements $75,000 1
Port Coquitlam Water Supply Improvements $1,000,000 11
Central Park and Cape Horn Pump Stations Improvements $6,000,000 68
Queensborough Pump Station Improvement $5,000,000 57
Port Moody Main - Stream Enhancements $500,000 6
Surrey Supply Improvements $2,000,000 23
Hellings Tank Improvement $50,000 1
Little Mountain Reservoir Improvement $50,000 1
River Road - East and West Mains Improvements $800,000 9
Burnaby Mountain Pump Station Improvement $250,000 3
Central Park Pump Station Improvements $250,000 3
Water main Meter Installation $500,000 6
Seymour Dam Safety Early-Warning ADAS System $100,000 1
Sewer Meter Installations and Upgrade $1,700,000 19
Serpentine River Crossing Scour Protection $500,000 6
Kersland and Central Park Reservoir Non-Cavitation Fill Valves $700,000 8
Tilbury Main Fraser River Crossing scour protection $250,000 3
Water Chambers Stairway Access on WM 2 & 5 and through out A1, A2, A3, A4. $2,000,000 23
Cleveland Dam Screen Component Replacement $100,000 1
Seymour Dam Electrical System Replacements $275,000 3
Fraser Sewerage Area and Water Distribution System Pump Refurbishments $420,000 5
Fraser Sewerage Area and Water Distribution System Electrical Refurbishments $1,950,000 22
Fraser Sewerage Area Meter Replacement $85,000 1
Fraser, Vancouver and North Shore Sewerage Areas Gas Detector Upgrade Project $400,000 5
Beach Yard Building Repair $125,000 1
Lake City Operations Center Egress Stair Corrosion Remediation $125,000 1
Critical Watershed Mainline Road Rehabilitation $600,000 7
Replace existing, inadequate water education centre for students $500,000 6
Replace Dec-Jan storm damage utility work buildings and sheds $180,000 2
Watershed Bridge Replacements (Twin Bridges, Paton Creek) $900,000 10
Removal of aging culverts; replace with fish friendly structures $230,000 3
Design and installation of new snow removal equipment storage sheds $50,000 1
Watershed Security Improvements (gates, fencing) including 2010 prep $250,000 3
Increase work space at watershed operations facility (design & construction) $470,000 5
Cariboo Dam Improvements (electrical, mechanical, instrumental) $750,000 9
Chubb Creek channel widening to improve conveyance through Burnaby $200,000 2
Regional District of Thompson-Nicola Pop: 122,286
Category: Water and wastewater
Black Pipes Community Water System $1,800,000 21
Evergreen Community Water System $1,100,000 13
Pritchard Community Water System $3,500,000 40
Savona Community Water System $1,600,000 18
Vavenby Community Water System $2,500,000 29
Pritchard Community Sewer System $500,000 6
Del Oro Community Water System $1,000,000 11
Loon Lake Community Water System $1,000,000 11
Category: Solid Waste
Eco-Deposit $ Recycling Network Combined $10,300,000 118
Pay-as-you Throw $2,800,000 32
Landfill Closures $5,800,000 66

Source: Federation of Canadian Municipalities

MOST POPULAR STORIES
TODAY’S TOP CONSTRUCTION PROJECTS

These projects have been selected from 337 projects with a total value of $3,003,381,002 that Reed Construction Data Building Reports reported on yesterday.

MAGNESIUM MINE

$900,000,000 Fraser Valley RD BC CANCELLED/ DEFERRED

BRIDGE AND OVERPASS ALTS

$125,000,000 Winnipeg MB Tenders

WIND FARM

$85,000,000 Peace River RD BC CANCELLED/ DEFERRED

Daily Top 10

ALEX’S ECONOMICS BLOG

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.

PROJECT NEWS BRIEFS
TODAY’S TOP JOBS

CONSTRUCTION ESTIMATOR
British Columbia-Victoria

Estimator
Ontario-Mississauga

Executive Officer
Ontario-Toronto

Communication and Events Coordinator
Ontario-Markham

Senior Estimator
Ontario-Toronto

Technical Sales
Ontario-Toronto

Quantity Surveyor/Estimator
Ontario-Oakville

PROJECT MANAGER & SITE SUPERVISOR
Ontario-Cambridge

Masonry Estimator
Ontario-Toronto

Drilling & Blasting Foreman
Ontario-Kingston

More jobs 

myJobsite.ca

Your gateway to
the top careers
in construction
and design